During the night of 11–12 March 2026, Expom completed another specialist heavy transport operation. At 10:00 p.m., two transport units carrying trolleys designed for port cranes left our facility.
Transported element parameters:
- Length: 11 metres
- Width: 5.8 metres
- Weight: just under 33 tonnes each
Loading such large and heavy components requires not only suitable equipment, but above all precise coordination and experience. Every stage of the operation – from preparing the structures, through loading and securing the cargo, to route planning – must be carried out with the highest level of care.
The Expom logistics and production teams made sure that the entire operation was carried out efficiently and safely. After careful preparation and securing of the cargo, the transport units set off, starting another stage of this demanding transport operation.
Projects like this show that Expom not only manufactures advanced steel structures, but also has the capability to professionally manage the entire logistics process – from assembly and loading to final delivery to the customer.